首页>
外国专利>
PARALLEL LEAD TIME DETERMINATIONS IN SUPPLY CHAIN ARCHITECTURE
PARALLEL LEAD TIME DETERMINATIONS IN SUPPLY CHAIN ARCHITECTURE
展开▼
机译:供应链架构中的并行提前时间确定
展开▼
页面导航
摘要
著录项
相似文献
摘要
A lead time calculation system includes a configured lead time generator and a measured lead time generator. The configured lead time generator calculates a lead time estimate to move products between a first node in a supply chain and a second node in the supply chain based on expected travel times, expected warehouse times, expected sourcing times, delivery schedules, unloading schedules, and product-node relationship data. A measured lead time generator receives electronic data interchange (EDI) events, receipts, and purchase order data and calculates an actual lead time for the first node and second node. The actual lead time can be compared with the configured lead time to evaluate performance of different aspects of the supply chain. Lead time estimates can be adjusted based on actual lead times that are measured by the measured lead time generator.
展开▼