首页> 外国专利> How to install a suspended load by a crane vessel

How to install a suspended load by a crane vessel

机译:如何用起重船安装吊重物

摘要

PROBLEM TO BE SOLVED: To provide a method of installing a hoisted load by a floating crane by which swinging of the hoisted load caused by oscillation of the floating crane can be reduced without using a complicated mechanism.SOLUTION: Hooks 21 suspended from each of jibs 11 and a beam body 23 extending to a direction parallel to the jibs 11 are connected to one another by a plurality of load suspending wires 22b, the hooks 21 suspended from each of the jibs 11 and a suspended load 24 are connected by a plurality of load suspending wires 22a which are arranged at an interval in the extending direction of the beam body 23 and positionally adjusted while vertically penetrating through the beam body 23, and the hooks 21 suspended from the adjacent jibs 11 are connected to each other by a rigid connection body 30 and the suspended load 24 is suspended by the jibs 11 so as to be moved to a predetermined position and installed.SELECTED DRAWING: Figure 2
机译:解决的问题:提供一种通过浮动起重机安装起重负载的方法,通过该方法,可以在不使用复杂机构的情况下减少由浮动起重机的振动引起的起重负载的摆动。解决方案:从每个吊臂悬吊的吊钩21如图11所示,通过多条载荷悬挂线22b将梁11和沿平行于悬臂11的方向延伸的梁主体23彼此连接,从悬臂11的每一个悬吊的钩21和悬吊的载荷24通过多个悬臂连接。在梁主体23的延伸方向上以一定间隔布置并在垂直方向穿过梁主体23的位置进行位置调节的载荷悬挂线22a与从相邻的副臂11悬挂的钩21通过刚性连接而彼此连接。主体30和悬吊的负载24被悬臂11悬吊,以便移动到预定位置并安装。图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号