首页> 外文OA文献 >Redeveloping contaminated lands with large-scale renewable energy facilities
【2h】

Redeveloping contaminated lands with large-scale renewable energy facilities

机译:利用大型可再生能源设施重建受污染的土地

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

This thesis uses case studies of one unsuccessful, and three successful brownfield-to-renewable energy projects to identify common barriers such projects face and how those barriers can be overcome. The most significant barriers identified are those typical of brownfield development: cleanup costs, liability risks, uncertainty, technical and legal complexity, and the need to coordinate multiple stakeholders. These barriers can be overcome through strong partnerships characterized by full cooperation among developers, property owners, regulators, and local officials. Political and public support enables cooperation between public and private stakeholders. This support is driven by an expectation that brownfield-to-renewable energy projects will improve the city's image and stimulate development of the clean energy industry locally. The three successful projects received substantial public support. This suggests that locating renewable energy facilities on contaminated lands is a possible solution to the siting controversies faced by new renewable energy facilities, and by wind farms especially. Renewable energy facilities offer a reuse option for brownfields that can coexist with ongoing remediation. Carving-out less polluted parcels from large properties for phased development is a strategy that has great potential to expand renewable energy development on brownfields and provide property owners revenue that can facilitate complete remediation. The thesis concludes with recommendations for local, state, and federal actions to encourage and facilitate brownfields-to-renewable energy projects. Recommended local level actions include incorporating renewable energy into municipal comprehensive plans and brownfield redevelopment programs. Overall, recommendations emphasize facilitating the "carve-out" strategy (i.e. use the cleanest parts of brownfields for new energy projects) and modifying financial incentives to favor brownfield sites.
机译:本文通过对一个失败的案例和三个成功的从棕地到可再生能源项目的案例研究来确定此类项目面临的共同障碍以及如何克服这些障碍。确定的最主要障碍是褐地开发的典型障碍:清理成本,责任风险,不确定性,技术和法律复杂性以及协调多个利益相关者的需求。通过建立牢固的伙伴关系可以克服这些障碍,这种伙伴关系的特点是开发商,房地产所有者,监管机构和地方官员之间的充分合作。政治和公共支持使公共和私人利益相关者之间能够合作。期望从棕地到可再生能源项目将改善城市形象并刺激当地清洁能源产业的发展,从而推动了这种支持。这三个成功的项目得到了公众的大力支持。这表明在受污染的土地上设置可再生能源设施可能是解决新可再生能源设施,尤其是风电场面临的选址争议的一种可能的解决方案。可再生能源设施为棕地提供了可重复使用的选择,可以与正在进行的修复并存。从大型物业中分摊污染较少的土地以进行分阶段开发是一项具有巨大潜力的战略,可以扩大棕地上的可再生能源开发,并为业主提供收入,以促进全面补救。本文最后提出了有关地方,州和联邦采取行动的建议,以鼓励和促进棕地到可再生能源项目的发展。建议的地方行动包括将可再生能源纳入市政综合计划和棕地再开发计划。总体而言,建议强调促进“分担”战略(即将棕地的最清洁部分用于新能源项目),并修改财务激励措施以偏爱棕地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号