首页> 外文OA文献 >Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions
【2h】

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

机译:用于更快,更好,更便宜的任务的地面数据系统风险缓解技术

摘要

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.
机译:随着更快,更便宜和更好的飞行任务的到来,NASA Projects意识到更高的风险是固有的,并且被这种方法所接受。但是,该项目的每个组成部分都必须使用航天器,有效载荷,运载火箭或地面数据系统,以确保该飞行任务取得无可比拟的成功。小型资源管理器(SMEX)计划的地面数据系统(GDS)团队开发了降低风险的技术,以自1989年开始实现这些目标。这些技术通过SMEX系列任务发展而来,并在Triana计划下得到了实践。这些技术是:(1)任务团队组织-赋予一个紧密的地面数据系统团队的力量,其中包括系统工程,软件工程,测试和飞行运营人员; (2)通用航天器测试与运行控制系统-利用发射前航天器集成系统作为发射后地面数据系统在轨指挥与控制系统; (3)在预发射试验中利用操作人员-使飞行操作小组在航天器制造阶段之初成为航天器测试活动的组成部分; (4)联合测试小组-结合系统,任务准备和运行测试,以优化地面系统和航天器的测试机会;和(5)。航天器,系统和人员的重复使用-在SMEX任务系列中重复使用人员,软件和在轨航天器。 SMEX地面系统开发方法用于更快,更便宜,更好的任务非常成功。本文将在地面数据系统设计,实施,测试和操作准备就绪领域中讨论这些风险管理技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号