首页> 美国政府科技报告 >Field Instrumentation and Measured Response of the I-295 Cable-Stayed Bridge: Part 2. Field Study of Thermal Responses
【24h】

Field Instrumentation and Measured Response of the I-295 Cable-Stayed Bridge: Part 2. Field Study of Thermal Responses

机译:I-295斜拉桥的现场仪表和测量响应:第2部分:热响应的现场研究

获取原文

摘要

The report describes the results of a field study of the thermal responses of a cable-stayed bridge. Data were gathered from the I-295 James River Bridge, a precast segmental concrete bridge with a cable-stayed main span consisting of twin box girders connected by delta frames. The thermal gradient and associated thermal strains in the box girders and pylons were measured using an extensive array of thermocouples and strain-gaged reinforcing bars installed at selected locations in the main-span box girder and south pylon. The temperature and strain response data were compared with that predicted from detailed finite element models of the structure using both frame and plate elements. Comparison revealed a complex three-dimensional strain pattern dependent on the wind direction and the angle of solar incidence.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号