首页> 美国政府科技报告 >Bridge Superstructure Research. Task 3. Final Designs and Details for Simple Span Bridges Made Continuous
【24h】

Bridge Superstructure Research. Task 3. Final Designs and Details for Simple Span Bridges Made Continuous

机译:桥梁上部结构研究。任务3.简单跨度桥梁的最终设计和细节连续进行

获取原文

摘要

This investigation was undertaken to develop standard details and supporting design information for retrofitting existing simple span bridges for continuity. By making the deck slab continuous, expansion joints that permit water to penetrate to the girders and substructure below can be eliminated. A major source of bridge deterioration is thus removed or minimized. In addition, the removal of expansion joints improves ride characteristics. The standard details presented in this report are based on a review of current retrofit practice in the United States and Canada, and analytical studies conducted to address several issues related to retrofitting existing bridges. Details are presented for prestressed concrete I-girders, prestressed concrete box beams, and steel I-girders. Two categories of retrofit detail are provided.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号