首页> 美国政府科技报告 >GRI/DOE Multi-Sites Fracture Diagnostics Project: Monitor Well No. 1 Drilling,Data Analysis and Instrument Emplacement. Topical Report, February 1995
【24h】

GRI/DOE Multi-Sites Fracture Diagnostics Project: Monitor Well No. 1 Drilling,Data Analysis and Instrument Emplacement. Topical Report, February 1995

机译:GRI / DOE多站点断裂诊断项目:监测井1钻井,数据分析和仪器安装。专题报告,1995年2月

获取原文

摘要

The Monitor Well No. 1 was drilled in February and March 1994 to a total depth of5,000 ft; 9-5/8-in. casing was subsequently run and cemented to 2,120 ft. In the drilling phase of the Monitor Well, 103 ft of core were cut and recovered in the C and B sand intervals and used as the basis for (1) description and orientation of natural or induced fractures; (2) description of lithologic and geologic character; (3) measurement of routine porosity and permeability data; and (4) measurement of special core analyses including circumferential velocity anisotropy (CVA). Log analysis data were acquired for characterization of natural and induced fractures, assessment of reservoir fluids and porosities, and development of a mechanical properties/stress profile. In October 1994, an instrumentation array composed of 30 accelerometers and 6 inclinometers was secured to a tubing string and run in the wellbore to the approximate depth interval between 4,014 and 4,882 ft. The tubing and attached instrumentation were cemented in place, thereby allowing comprehensive fracture diagnostics experiments to be implemented.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号