首页> 美国政府科技报告 >Slimhole and Coiled Tubing Standards Phase 1. Weld Technology (January 1996).Final Report, September 1994-December 1995
【24h】

Slimhole and Coiled Tubing Standards Phase 1. Weld Technology (January 1996).Final Report, September 1994-December 1995

机译:slimhole and Coiled Tubing standards phase 1. Weld Technology(1996年1月).Final Report,1994年9月 - 1995年12月

获取原文

摘要

The reliability and understanding of coiled tubing (CT) welds is an issue ofconcern in the oil and gas industry. Much work has been done to understand the fatigue characteristics of the base CT material. Until recently, little work had been done to understand the fatigue life of the CT welds, which are the weakest points in the CT string. A separate project funded by a joint industry group, recently performed a large number of fatigue tests on CT welds. This separate study showed significant room for improvement in the understanding of CT welds. The GRI-supported project attempts to improve the understanding of CT weld technology and methods by analyzing failed weld samples, reviewing and recommending new CT welding procedures and reviewing alternative welding techniques which could be use for CT welding.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号