首页> 美国政府科技报告 >Field Performance of Timber Bridges. 8. Lynches Woods Park Stress-Laminated DeckBridge
【24h】

Field Performance of Timber Bridges. 8. Lynches Woods Park Stress-Laminated DeckBridge

机译:木材桥梁的现场性能。 8.林奇伍兹公园压力层压甲板桥

获取原文

摘要

The Lynches Woods Park bridge was constructed during the summer of 1990 inNewberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that is approximately 30-ft long and 16-ft wide, and 14 in. deep. The bridge is unique in that it is the first known stress-laminated deck bridges to be constructed of Southern Pine lumber treated with chromated copper arsenate. The performance of the bridge was continuously monitored for approximately 3 years, beginning at the time of installation. Performance monitoring involved gathering and analyzing data relative to the moisture content, the force level of stressing bars, and behavior under static-load conditions. In addition, comprehensive visual inspections were conducted to assess the overall structure condition.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号