首页> 美国政府科技报告 >Phase 2 - GASB Statement 34 Compliance: Development of Fixed Asset (Infrastructure);Final rept. 1 Feb 02-10 May 03
【24h】

Phase 2 - GASB Statement 34 Compliance: Development of Fixed Asset (Infrastructure);Final rept. 1 Feb 02-10 May 03

机译:第2阶段 - GasB声明34合规性:固定资产(基础设施)的发展;最终报告。 1月2日至10月3日

获取原文

摘要

The Alabama Department of Transportation (ALDOT) Bureau of Materials and Tests has been working with the University of Alabama Management Information Systems Department to provide a tool for road maintenance and optimization associated funding. Specifically, ALDOT required an operational tool to: capture data collected by state road inspectors and RoadWare Inc. (a private firm); manage the verification and validation of the data; and accurately conduct analysis and reporting on this data. In 2001 the Governmental Accounting Standards Board (GASB) issued a mandate that required each state to report its roadway conditions annually. Initially, the reporting was the main focus of this research project, however; the University of Alabama was able to create a more robust Pavement Management System that was more than a simple reporting methodology. Upon implementation, the system (named HYDRA+) will make ALDOT compliant with GASB reporting requirements. It will also provide operational capabilities such as producing Preliminary Pavement Rating (PPR) reports, friction reports, and extensive ad hoc reports. The system can provide the data in a geographic format that can be mapped.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号