首页> 美国政府科技报告 >U.S. Nuclear Regulatory Commission Standard Review Plan 14.2.1 Generic Guidelines for Extended Power Uprate Testing Programs
【24h】

U.S. Nuclear Regulatory Commission Standard Review Plan 14.2.1 Generic Guidelines for Extended Power Uprate Testing Programs

机译:美国核管理委员会标准审查计划14.2.1扩展电力提升测试计划的通用指南

获取原文

摘要

This Standard Review Plan (SRP) section provides general guidelines for reviewing proposed extended power uprate (EPU) power ascension testing programs. This review provides assurance that the proposed testing programs adequately demonstrate that plant structures, systems, and components (SSCs) important to safety that are affected by the proposed power uprate will perform satisfactorily in service at the proposed uprated power level. There are three types of power uprates. Measurement uncertainty recapture power uprates involve power increases of less than 2 percent, and are achieved by implementing enhanced techniques for calculating reactor power. Stretch power uprates typically involve power increases of up to 7 percent and do not generally involve major plant modifications. EPUs involve power increases greater than stretch power uprates and have been approved for increases as high as 20 percent. EPUs usually involve significant modifications to major balance of plant (BOP) equipment. A power uprate is classified as an EPU based on a combination of the magnitude of the proposed power increase and the plant modifications necessary to support the requested uprate. This SRP applies only to EPU license amendment requests (LARs).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号