首页> 美国政府科技报告 >Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): Northern States Power Company Minnesota, Sherburne County Power Station, Becker, Minnesota. (Final Report)
【24h】

Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3): Northern States Power Company Minnesota, Sherburne County Power Station, Becker, Minnesota. (Final Report)

机译:大坝安全煤燃烧表面蓄水评估(任务3):北方国家电力公司明尼苏达州,sherburne县电站,Becker,明尼苏达州。 (总结报告)

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project no. 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Northern States Power Company-Minnesota's (d/b/a of Xcel Energy) Sherburne County Power Station, located in Becker, Minnesota. CHA made a site visit on September 16, 2009 to inventory coal combustion surface impoundments at the facility, to perform visual observations of the impoundment dikes, and to collect relevant information regarding the Bottom Ash Pond, Pond No. 1, Pond No. 2 and Pond No. 3 impoundments.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号