首页> 美国政府科技报告 >Phase 2: Location Tracking of Test Vehicles for Bridge Load Rating
【24h】

Phase 2: Location Tracking of Test Vehicles for Bridge Load Rating

机译:第2阶段:桥梁额定载荷的试验车辆位置跟踪

获取原文

摘要

The purpose of this research project is to augment the work of the Phase 1 project, 930-671, which provides the bridge maintenance bureau with tools for load testing of bridges. Currently, the load testing team uses sensors and weighted trucks to load bridges in a controlled fashion. The sensors then collect data from the bridges under load conditions, and from this data the proper bridge rating can be determined. However, the ALDOT load testing team desires to capture the exact position of the load vehicle with respect to the sensor data. In order to accomplish this, they need an additional system which can measure the vehicle position and automatically feed this information into the data acquisition system in real-time. In Phase 1 (project 930-671), the research team developed such a device using an optical tracker which when mounted to the test vehicle, would provide position of the vehicle relative to the road surface. This system provided both tracking and a data readout in cab of the test vehicle.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号