首页> 美国政府科技报告 >Commonwealth of Massachusetts Safety Review of the Central Artery/Tunnel Project was Comprehensive, but FHWA's Oversight Approach has Shortcomings
【24h】

Commonwealth of Massachusetts Safety Review of the Central Artery/Tunnel Project was Comprehensive, but FHWA's Oversight Approach has Shortcomings

机译:马萨诸塞州中央动脉/隧道项目安全评估是全面的,但FHWa的监督方法有缺点

获取原文

摘要

Following the July 2006 incident in Bostons Central Artery/Tunnel (CA/T) Projectin which concrete ceiling panels fell and killed a motoristthe Commonwealth of Massachusetts initiated an independent Stem to Stern safety review of the Boston Metropolitan Highway System, including the CA/T Project. The review, completed in August 2008, was performed in two phases: Phase I identified immediate risks to public safety, while Phase II served as an evaluation of all safety risks.1 The National Transportation Safety Board Reauthorization Act of 20062 1 Phase I was a 90-day review to assess conditions that posed immediate safety risks and was completed in November 2006. Phase II was a longer, more comprehensive review to assess conditions that pose longer-term safety risks and was completed in August 2008. directed the Office of Inspector General (OIG) to provide independent oversight of safety review activities performed by the Federal Highway Administration (FHWA) and the Commonwealth, as they pertained to the CA/T Project. Our broad objective was to assure Congress, the Secretary of Transportation, and the public that the safety review was comprehensive and performed in a rigorous and complete manner.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号