首页> 美国政府科技报告 >Development of Pavement Evaluation Equipment. Final Report: Phase II
【24h】

Development of Pavement Evaluation Equipment. Final Report: Phase II

机译:路面评估设备的开发。最终报告:第二阶段

获取原文

摘要

The final report of the first Phase of this project recommended the fabrication and development of two items of pavement test equipment, the duomorph and the mobile acoustic crack detector. A working model of the duomorph, satisfactory for the evaluation of the dynamic moduli of most asphalt pavements, was fabricated and delivered along with the necessary power supply and signal conditioning circuitry necessary to make it operate. The process for reducing the data obtained from the sensor is described. The necessary charts and graphs are included as is an expanded checklist for duomorph operation. Stiffnesses obtained using the duomorph are compared with resilient moduli measured in the laboratory. These comparisons are encouraging. The development of a mobile crack detector progressed well except for difficulty with the rolling acoustic transmitter. The mobile transmitter consistently sent more energy to the receivers through the air than through the pavement. This served to mask the effects of intervening pavement cracks on the signal to the extent that the detector is ineffectual. Further development will require better acoustic isolation of the transmitting device.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号