The Trolley Coach: Potential Market, Capital and Operating Costs, Impacts and Barriers. Task 2 Report for the Electric Trolley Bus Feasibility Study

机译:电车教练:潜在市场,资本和运营成本,影响和障碍。任务2电动无轨电车可行性研究报告

获取原文

摘要

This Task 2 report contains a summary of the Task 1 report (PB80-104870) and an examination of the potential market for trolley coach (TC) systems in the United States. TC capital and operating costs are estimated, and the impacts of TC transportation on land use, community aesthetics, and energy consumption are described. In this report, potential barriers to TC expansion are identified and possible UMTA policies are discussed. Some of the conclusions stated in this report are that: improvements in TC technology such as chopper control reduces power consumption 20 percent and provides a smoother ride quality; cost of overhead wire installation is the most significant barrier to new TC systems; there is a definite advantage to TC expansion in terms of long term flexibility of energy source use, and long term reliability of energy supply; and UMTA should maintain a basically neutral position on TC expansion--initiative for such expansion should originate at the local level.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号