首页> 美国政府科技报告 >Walk-Through Survey Report, Contract 210-77-0096, General Motors Assembly Division, Fairfax Plant, 100 Kindelberger Road, Kansas City, Kansas 66115
【24h】

Walk-Through Survey Report, Contract 210-77-0096, General Motors Assembly Division, Fairfax Plant, 100 Kindelberger Road, Kansas City, Kansas 66115

机译:Walk-Through survey Report,Contract 210-77-0096,General motors assembly Division,Fairfax plant,100 Kindelberger Road,Kansas City,Kansas 66115

获取原文

摘要

The plant is not ideal for an industrial hygiene survey even though huge quantities of paint are used, painters do not use respirators, and the process is continuous. The workers in the spray booths are well spaced and automatic paint spray application equipment keeps employee exposure to overspray to a minimum. The booths seem to eliminate potential for exposure to paint. The stability of this workforce makes the General Motors Plant an appropriate one for an epidemiological study of automotive OEM.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号