首页> 美国政府科技报告 >Catalytic Radiant Tube. Phase 2. Proof of Concept. Phase 3. Catalyst and Tube Evaluation. Final Report February 1, 1986-April 30, 1988
【24h】

Catalytic Radiant Tube. Phase 2. Proof of Concept. Phase 3. Catalyst and Tube Evaluation. Final Report February 1, 1986-April 30, 1988

机译:催化辐射管。阶段2.概念证明。阶段3.催化剂和管评估。最终报告1986年2月1日至1988年4月30日

获取原文

摘要

Phase 2, Proof of Concept, covered testing of both ceramic and metal tubes with either oxide or precious metal catalysts applied to the interior tube wall. Premixed natural gas and air was reacted at the catalyzed wall and the energy produced by combustion conducted through the tube wall and was transmitted primarily by radiation to the load. Exterior tube wall temperatures of 2000 F were achieved and NOx emissions were less than 5 ppmv. A major problem, however, was catalyst durability. The best results were obtained with a 3/4 inch OD x 1/2 inch ID x 12 inch L silicon carbide tube with a platinum catalyst. The tube remained radiant less than 10 hours during continuous operation. Based on the results of Phase 2 testing, Phase 3 work was directed toward improving radiant tube longevity. Research was specifically focused on the washcoat (catalyst support) in an effort to improve catalyst life and therefore extend radiant tube life. A zirconia washcoat was developed which has excellent stability and surface area retention at temperatures encountered in catalytic radiant tubes (1600-2200 F). The washcoat was used as a support for a platinum catalyst on both metal and ceramic tubes. Catalytic radiant tube life was significantly extended from 10 hours to nearly 1000 hours using the zirconia washcoat.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号