首页> 美国政府科技报告 >Environmental Assessment for Replacement of Taxiway Sierra, Taxiway Whiskey, Pad 12, and Pad 13 at Joint Base Andrews-Naval Air Facility Washington, Prince George's County, Maryland.
【24h】

Environmental Assessment for Replacement of Taxiway Sierra, Taxiway Whiskey, Pad 12, and Pad 13 at Joint Base Andrews-Naval Air Facility Washington, Prince George's County, Maryland.

机译:在马里兰州乔治王子县华盛顿联合基地安德鲁斯 - 海军航空设施更换滑行道塞拉利昂,滑行道威士忌,第12道和第13道的环境评估。

获取原文

摘要

JBA proposes to improve its operational efficiency by replacing Taxiways Sierra and Whiskey and Pads 12 and 13 on the airfield. The task for Taxiway Sierra would include demolishing and replacing approximately 49,500 square yards (10 acres) of existing pavements and shoulders and improving or replacing the taxiway's drainage, signage, and lighting systems. The task for Taxiway Whiskey would include replacing approximately 208,100 square yards (43 acres) of existing pavements and shoulders and improving or replacing the taxiway's drainage, signage, and lighting systems. Taxiway Sierra would be replaced before work on Taxiway Whiskey began. The area of Pad 12 is approximately 7,340 square yards (1.5 acres), and the area of Pad 13 is approximately 7,280 square yards (1.5 acres). The pavement on both pads is about 10 inches thick. Replacing the pads would include excavation, site preparation, striping, restoration of disturbed areas, and all necessary and essential utilities work to satisfy JBA operational requirements. Pads 12 and 13 would be replaced after work on Taxiway Whiskey was completed. This environmental assessment (EA) has been prepared to address the potential impacts of undertaking the abovementioned project. This EA has been prepared to report an evaluation of the proposed action and alternatives, including the No Action Alternative. Resource areas addressed in the EA are noise, air quality, safety and occupational health, earth resources, water resources, infrastructure/utilities, transportation, hazardous materials and wastes, biological resources, cultural resources, historic and archaeological resources, socioeconomics (including environmental justice and protection of children), land use and visual resources, and sustainability and greening. The Draft EA was made available to agencies and the public for a 30-day comment period from March 7, 2013, to April 7, 2013.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号