首页> 美国政府科技报告 >Definition, Technology Readiness, and Development Cost of the Orbit TransferVehicle Engine Integrated Control and Health Monitoring System Elements (Final
【24h】

Definition, Technology Readiness, and Development Cost of the Orbit TransferVehicle Engine Integrated Control and Health Monitoring System Elements (Final

机译:轨道转移车辆发动机综合控制和健康监测系统元件的定义,技术准备和开发成本(最终版)

获取原文

摘要

An Integrated Control and Health Monitoring (ICHM) system was conceived for useon a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号