首页> 美国政府科技报告 >Pre-Flight Dark Forward Electrical Testing of the Mir Cooperative Solar Array
【24h】

Pre-Flight Dark Forward Electrical Testing of the Mir Cooperative Solar Array

机译:mir合作太阳能电池阵列的飞行前黑暗正向电气测试

获取原文

摘要

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States (US) and Russia to provide approximately 6 kW of photovoltaic power to the Russian space station Mir. After final assembly in Russia, the MCSA was shipped to the NASA Kennedy Space Center (KSC) in the summer of 1995 and launched to Mir in November 1995. Program managers were concerned of the potential for MCSA damage during the transatlantic shipment and the associated handling operations. To address this concern, NASA Lewis Research Center (LERC) developed an innovative dark-forward electrical test program to assess the gross electrical condition of each generator following shipment from Russia. MCSA dark electrical testing was successfully performed at KSC in July 1995 following transatlantic shipment. Data from this testing enabled engineers to quantify the effects of potential MCSA physical damage that would degrade on-orbit electrical performance. In this paper, an overview of the principles and heritage of photovoltaic array dark testing is given. The specific MCSA dark test program is also described including the hardware, software, testing procedures and test results. The current-voltage response of both solar cell circuitry and by-pass diode circuitry was obtained. By comparing the actual test data with the predictions, the physical condition of the generator could be inferred. Based on this data analysis, no electrical short-circuits or open-circuits were detected. Good agreement between the test data and computational predictions indicated MCSA electrical performance was amenable to accurate analysis and was well understood.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号