首页> 美国政府科技报告 >KE Basin monorail modification for the sludge removal and packaging project
【24h】

KE Basin monorail modification for the sludge removal and packaging project

机译:KE盆地单轨改造为污泥清除和包装项目

获取原文

摘要

The 105KE Basin currently stores over 1,100 metric tons of various N Reactor spent fuel in several canister forms, as well as several metric tons of sludge which must be removed. Modifications will consist of anchoring a permanent steel frame directly into the pit walls between existing columns and adding two travelling hoist rails, each capable of two directional motions. Each pit will have its own capability for targeting loads to any point inside the working areas of these pits. The structural frame designed for the monorail system at the Weasel and Tech-View pits was qualified as adequate for normal/operating loads, and dead plus live loads combined with seismic loads. The hoist operating live load is limited to 2,000 lb. The physical strength of the existing pit walls where the base plates are to be structurally anchored is unknown. The original structural drawings specified a minimum concrete strength of 3,000 lb/in(sup 2). A pullout test should be performed to verify the strength of this concrete base. To reduce radiation exposure to levels as low as reasonably achievable (ALARA), installation and erection work inside the basin controlled area must be minimized; therefore, the pieces required for the modifications should be numbered in the fabrication shop, and erection should follow a procedure that corresponds to the assembly sequence indicated by the numbers. In conjunction with final erection, a mock-up activity should be conducted and base-plate locations verified to be within dimensional tolerances.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号