Simulation of Multi-Canister Overpack (MCO) Handling Machine Impact with Cask/MCO During Insertion into the Transfer Pit (FDT-137)

机译:模拟多罐外包装(mCO)处理机器在插入转移坑(FDT-137)期间对桶/ mCO的影响

获取原文

摘要

The objective of this engineering effort is to provide independent engineering evaluations/analyses of the accidental impact of the MHM with the cask/MCO during insertion into the CSB transfer pit. The maximum MHM velocity is specified to be 40 ft per min. The total weight moving with the MHM is assumed to be 1 million pounds. The cask/MCO is assumed to be supported by a crane, hanging from the lifting fixture. The cask/MCO is assumed to be partially inserted into the 56 inch inside diameter transfer pit.