首页> 美国政府科技报告 >BLANKET BIOLOGICAL REVIEW FOR GENERAL MAINTENANCE ACTIVITIES WITHIN ACTIVE BURIAL GROUNDS, 200 E and 200 W Areas, ECR No. 2002-200-034
【24h】

BLANKET BIOLOGICAL REVIEW FOR GENERAL MAINTENANCE ACTIVITIES WITHIN ACTIVE BURIAL GROUNDS, 200 E and 200 W Areas, ECR No. 2002-200-034

机译:活动埋地地区,200 E和200 W地区的一般维护活动的BLaNKET生物学评论,ECR No. 2002-200-034

获取原文

摘要

No plant and animal species protected under the ESA, candidates for such protection, or species listed by the Washington state government were observed in the vicinity of the proposed sites. Piper's daisy may still occur in some of the burial grounds. This is a Washington State Sensitive plant species, and as such is a Level III resource under the Hanford Site Biological Resources Management Plan. Compensatory mitigation is appropriate for this species when adverse impacts cannot be avoided. The Ecological Compliance Assessment Project (ECAP) staff should consulted prior to the initiation of major work activities within areas where this species has been identified (218-E-12, 218-E-10). The stalked-pod and crouching milkvetch are relatively common throughout 200 West area, therefore even if the few individuals within the active burial grounds are disturbed, it is not likely that the overall local population will be adversely affected. The Watch List is the lowest level of listing for pl ant species of concern in the State of Washington. No adverse impacts to species or habitats of concern are expected to occur from routine maintenance within the active portions of the 218-W-4C, 218-W-4B, 218-W-3, 218-W-3A, and 218-W-5 burial grounds, as well as the portion of 218-E-12B currently used for storage of retired submarine reactor cores. The remaining portions of the 218-E-12B burial ground, the entire 218-E-10 burial ground, and the 218-W-6 burial ground currently have extensive vegetative cover and it is highly likely that migratory birds, such as meadow larks, horned larks, and curlews will nest in these areas. Therefore, it is recommended that if removal of the existing vegetation is required for burial ground operations, such removal only occur during the August through March time period (i.e. when the birds are not actively nesting). This blanket review does not apply to the portions of 218-W-4C, and 218-W-6 previously described.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号