首页> 美国政府科技报告 >Industrial Fuel Gas Demonstration Plant Program TASK Ⅲ REPORT DEMONSTRATION PLANT MECHANICAL DESIGN VOLUME ⅩⅠ COOLING TOWER FLARE
【24h】

Industrial Fuel Gas Demonstration Plant Program TASK Ⅲ REPORT DEMONSTRATION PLANT MECHANICAL DESIGN VOLUME ⅩⅠ COOLING TOWER FLARE

机译:工业燃气示范工厂项目任务Ⅲ报告示范工厂机械设计量ⅩⅠ冷却塔火炬

获取原文

摘要

A.The vendor shall quote on the base system outlined in this requisition. If the base system differs from a standard vendor package, the standard item shall be quoted as an alternate, with appropriate price adjustments included in the proposal.nB.The following equipment and services will be provided by the PURCHASER.n1.tInstallation of the preassembled equipment package furnished by the vendor.n2.tinterconnections of piping electrical and control wiring between the vendor’s and purchaser’s interrelated equipment.nSulfuric acid storage drum (Item D-4501).

著录项

  • 作者

  • 作者单位
  • 年度 1980
  • 页码 1-107
  • 总页数 107
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号