首页> 美国政府科技报告 >Review of the Commissioning and Initial Operation of the NSF (Nuclear Structure Facility) Tandem Accelerator.
【24h】

Review of the Commissioning and Initial Operation of the NSF (Nuclear Structure Facility) Tandem Accelerator.

机译:审查NsF(核结构设施)串联加速器的调试和初始运行。

获取原文

摘要

An account is given of the initial voltage tests before and after the installation of the intershield. Accelerator tube testing, installation and conditioning is described and tube performance is discussed. The main features of the injector system and of the beam optical system within the accelerator are described. A brief summary is given of machine performance to date including voltages attained and ion species accelerated. Proposed developments and improvements are discussed. 9 refs., 11 figs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号