首页> 美国政府科技报告 >M-2 Bailey Bridge (M2BB) Palletization Test Report
【24h】

M-2 Bailey Bridge (M2BB) Palletization Test Report

机译:m-2贝利桥(m2BB)货盘化测试报告

获取原文

摘要

This report addresses the M-2 Bailey Bridge Palletization Test conducted at theU.S. Army Engineer School at Fort Leonard Wood, Missouri from 7 to 12 April 1997. The objectives of this test were to verify the feasibility of the M2BB Palletization Flatrack Load Configurations using M1/M1077 PLS Flatracks and to assure that these loads could be uploaded, downloaded, transloaded, and transported safely. The test was conducted successfully and its results showed that the M2BB Palletization Flatrack Load Configurations can be used effectively and safely. Loading and tiedown procedures for palletization were documented in detail during the test. These procedures will be incorporated into the M-2 Bailey Bridge manual.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号