Optimization of Continuous Maintenance Availability Scheduling.

机译:连续维护可用性调度的优化。

获取原文

摘要

Every few months each United States submarine must return to a port to undergo major maintenance that cannot be conducted at sea. These maintenance periods are called Continuous Maintenance Availability (CMAV) periods. All CMAV scheduling aboard the two remaining submarine tenders in the United States fleet, the USS Emory S. Land (AS 39) and the USS Frank Cable (AS 40), is currently done manually. The schedulers rely on their experience and sound judgment with the goal of successfully completing the most maintenance as quickly and efficiently as possible for approximately 200 jobs, 50 maintenance shops and a host of other considerations. In this thesis, we develop a job-shop scheduling model, the CMAV Scheduler (CMAV-S). This is a large-scale, mixed-integer, linear program that accounts for a variety of scheduling inputs commonly used by planners: job priority, duration, allowed window of execution, prerequisites, mandatory character, workforce used and available (by shop), and special submarine conditions (active or inactive) needed to perform a job. CMAV-S produces near-optimal schedules that achieve maximum value for all scheduled jobs in about one minute. When compared to our own manual scheduling, we observe CMAV-S improves up to 25% the required CMAV length to schedule all maintenance.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号