首页> 美国政府科技报告 >Environmental Assessment: Proposed Construction of Air Force Non-Appropriated Funds Bowling Center at Maxwell Air Force Base, Gunter Annex.
【24h】

Environmental Assessment: Proposed Construction of Air Force Non-Appropriated Funds Bowling Center at Maxwell Air Force Base, Gunter Annex.

机译:环境评估:建议在马克斯韦尔空军基地,Gunter附件建造空军非拨款基金保龄球中心。

获取原文

摘要

The purpose of the proposed action is to construct a new 10-lane bowling center to replace the existing 6-lane bowling center, which is incompatible with future land use plans. The base classifies the existing structure as Condition Code 3 (substandard). The current bowling center is losing business, particularly from league bowlers who find that the conditions are too inconsistent. A new bowling center at Gunter would be able to support an expanded league business and allow lanes for simultaneous open bowling as well. The no action alternative is continued use of the existing facility. Resources considered were air quality, noise, land use geological resources, water resources, biological resources, transportation and circulation cultural resources, socioeconomics, environmental justice and protection of children, hazardous materials and wastes, and utilities. No significant impacts would result from the proposed action.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号