首页> 美国政府科技报告 >Final Environmental Assessment for Proposed Enhanced Testing and Associated Training Use of the Giant Reusable Air Blast Simulator (GRABS) Site at Kirtland Air Force Base, New Mexico.
【24h】

Final Environmental Assessment for Proposed Enhanced Testing and Associated Training Use of the Giant Reusable Air Blast Simulator (GRABS) Site at Kirtland Air Force Base, New Mexico.

机译:建议增强测试和相关培训的最终环境评估使用新墨西哥州Kirtland空军基地的巨型可重复使用空气冲击模拟器(GRaBs)场地。

获取原文

摘要

Pursuant to the Council on Environmental Quality regulations for implementing the procedural provisions of the National Environmental Policy Act (NEPA), Title 40 of the Code of Federal Regulations (CFR) 1500-1508; Department of Defense Directive 6050.1 and the Air Force Environmental Impact Analysis Process (EIAP), 32 CFR Part 989, the Defense Threat Reduction Agency (DTRA) in coordination with the Air Force has prepared an Environmental Assessment (EA) to identify and evaluate potential environmental impacts from the proposed enhanced testing and associated training of DTRA's approximately 155-acre Giant Reusable Air Blast Simulator (GRABS) site at Kirtland Air Force Base (AFB), New Mexico. The mission of GRABS site is to test blast resistance of various structural and equipment components by simulating a nuclear blast using explosives in a variety of scenarios. In 1993 DTRA completed an initial EA, which resulted in a Finding of No Significant Impact (FONSI) addressing activities performed at the GRABS site. Since that time, testing methodologies and types of activities I equipment used continue to change and evolve. Given the length of time that has elapsed, DTRA and the Air Force have determined an update to the 1993 EA is appropriate. This EA describes and evaluates the potential environmental impacts of enhanced testing and associated training activities currently conducted at the GRABS site, as well as reasonably foreseeable future ones. The findings of the 1993 EA, which remain directly relevant to the Proposed Action, are incorporated by reference into this EA. DTRA proposes to continue ongoing explosive test events at the GRABS site and to conduct additional, enhanced test activities in accordance with their current and emerging mission requirements. One of the new tests would use a biological simulate known as Bacillus thuringiensis kurstaki (Btk), a naturally occurring aerobic bacterium used in agriculture as a commercial organic insecticide.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号