首页> 美国政府科技报告 >Heating and Cooling Master Plan for Fort Bragg, NC, Fiscal Years 2005 to 2030
【24h】

Heating and Cooling Master Plan for Fort Bragg, NC, Fiscal Years 2005 to 2030

机译:2005年至2030年,北卡罗来纳州布拉格堡的供暖和制冷总体规划

获取原文

摘要

Fort Bragg, NC contains many buildings serviced by systems and utilities that have not been modified and upgraded over the years. Some central energy plants and distribution systems (hot water, chilled water, and steam) are now nearing the end of their useful life. Although the number of new construction (under MILCON Transformation) and retrofit projects is growing, no overall strategy or central master plan exists for the installation's heating and cooling generation and distribution systems. There are mixed and opposing opinions on what strategy to follow (e.g., centralized versus decentralized systems). With Fort Bragg's total HVAC energy cost in fiscal year 2005 of approximately $24 million, it is critical to analyze different options to provide reliable heating and cooling loads to the installation's buildings; reduce energy and water wastes and inefficiencies on the generation and distribution side; and coordinate related construction, upgrade, operation and maintenance projects, and optimize their costs. This report provides a detailed study on how to optimize Fort Bragg's district heating and district cooling systems, and presents measures to convert the large district heating and district cooling systems into state-of-the-art systems, and to integrate their future development into Fort Bragg's master plan.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号