首页> 美国政府科技报告 >Performance, Award Fee and Cost Incentives during System Design and Development
【24h】

Performance, Award Fee and Cost Incentives during System Design and Development

机译:系统设计和开发过程中的绩效,奖励和成本激励

获取原文

摘要

The analysis addresses the use of Performance Incentives and Award Fees in DoD contracting, during System Development and Demonstration (SDD). There is discussion of the F/A-18E/F contract that included cost-sharing, Performance Incentives and Award Fees. However, we first discuss recent GAO criticism of profits received on Award Fee contracts and the response by DoD and other organizations. Next, the general policy guidelines established in 1969 by DoD and NASA that are still in effect are reviewed, as are the recommendations made by academic economists beginning in the 1970s. We also discuss the recent introduction of System Design Specifications. While these specifications contain a great deal of information that can be used when developing Performance Incentives and Award Fees, this new policy represents a movement away from performance specifications and may constrain a contractor's ability to make trade-off decisions. The broad conclusion of this analysis is that the intuition obtained from the 1969 DoD and NASA Guide might be combined with that of economists when properly structuring incentive contracts. This may help achieve the objectives of the government when there is pervasive cost uncertainty, challenging performance characteristics, and certain contractor actions not easily observable by the government.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号