Construction of all meters for this contract has been completed by the Weston Quality Assurance Laboratory.nPre-production testing by the Weston Quality Assurance Laboratory of all ranges of the 180 meters, with the exception of the 15-0-15μa range has been completed.nPre-production testing of all meters is in progress. All sizes and meter ranges included in this contract have successfully passed the Group I and Croup V tests of Specification SCS-43A.nReports covering die pre-production testing for ranges of 0-1 ma, and O-50Vof the 180°meters have been issued to USAEMSA.nAll production tooling has been completed.
展开▼