首页> 美国政府科技报告 >Amplification to the Final Environmental Impact Statement New River and Phoenix City Streams Flood Control Project, Maricopa County, Arizona
【24h】

Amplification to the Final Environmental Impact Statement New River and Phoenix City Streams Flood Control Project, Maricopa County, Arizona

机译:扩大到最终环境影响声明新河和菲尼克斯城流防洪项目,亚利桑那州马里科帕县

获取原文

摘要

This amplification report addresses a point of concern raised by the Arizona State Historic Preservation Officer regarding the effect of the proposed project on Cave Creek Dam. Cave Creek Dam, a historic concrete arch dam, is within the reservoir area of the authorized Cave Buttes Dam, which is a major component of the New River and Phoenix City Streams Flood Control Project. It was determined that modifications to Cave Creek Dam sufficient to make it meet the Corps Dam safety standards would be prohibitively expensive and would alter the physical appearance of the dam. The recommended plan allows the dam to be overtopped, but creates a stilling pool no more than 10 feet lower than the floodwater being impounded by the historic dam. This pool minimizes the physical stresses on the dam, provides stability during floods, and absorbs the erosive energy of floodwater overtopping the dam, thus preventing the dangerous undermining of the dam's foundation.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号