首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Dan Hole Pond Dam (NH 00376) (NHWRB 188.01), Saco River Basin, Ossipee, New Hampshire. Phase I Inspection Report.
【24h】

National Program for Inspection of Non-Federal Dams. Dan Hole Pond Dam (NH 00376) (NHWRB 188.01), Saco River Basin, Ossipee, New Hampshire. Phase I Inspection Report.

机译:国家非联邦大坝检查计划。 Dan Hole pond Dam(NH 00376)(NHWRB 188.01),saco River Basin,Ossipee,New Hampshire。第一阶段检查报告。

获取原文

摘要

Dam Hole Pond Dam is a 114 foot long, concrete faced, cemented stone masonry gravity structure with a maximum height of approximately 12.5 feet. The dam includes 54.5 feet of broad crested spillway separated into 33.5 foot and 21 foot sections by a gate house. The dam in intermediate in size with a significant hazard potential. The test flood is in the range of 1/2 the PMF to full PMF. The dam is in poor condition at the present time. There was serious seepage noted at the toe of the dam; which requires prompt attention. Operationally, the dam requires some routine maintenance to preclude the development of more serious problems.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号