首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Powdermill Brook Detention Dam (MA 00605) Connecticut River Basin, Westfield, Massachusetts. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Powdermill Brook Detention Dam (MA 00605) Connecticut River Basin, Westfield, Massachusetts. Phase I Inspection Report

机译:国家非联邦大坝检查计划。 powdermill Brook Detention Dam(ma 00605)康涅狄格河流域,Westfield,马萨诸塞州。第一阶段检查报告

获取原文

摘要

The dam is a 642 ft. long, 60 ft. high earth embankment flood retention dam. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The dam is generally in good condition. It should be assured that the gate on the intake structure is in good working order. Barriers should be installed to prevent further intrusion by motorized vehicles. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号