首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Emery Mills Dam (ME-00186), Mousam River Basin, Shapleigh, Maine. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Emery Mills Dam (ME-00186), Mousam River Basin, Shapleigh, Maine. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。 Emery mills Dam(mE-00186),mousam River Basin,shapleigh,缅因州。第1阶段检验报告

获取原文

摘要

The dam is about 250 ft. long with a height of about 26 ft. It is a stone masonry and concrete gravity dam with earth embankment wing walls. The dam is assessed to be in good condition. The dam structure lacks the benefit of routine maintenance. It is intermediate in size with a hazard potential of high.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号