首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Woonsocket Reservoir Number 3 Dam (RI 02505) Blackstone River Basin, Smithfield-North Smithfield, Rhode Island. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Woonsocket Reservoir Number 3 Dam (RI 02505) Blackstone River Basin, Smithfield-North Smithfield, Rhode Island. Phase I Inspection Report

机译:国家非联邦大坝检查计划。 Woonsocket水库3号水坝(RI 02505)黑石河流域,史密斯菲尔德 - 北史密斯菲尔德,罗德岛。第一阶段检查报告

获取原文

摘要

The dam is an earth embankment about 1500 ft. long and 27 ft. high. The dam is in fair condition. To assure the long term performance of the dam, several items of concern require attention. The dam is intermediate in size with a high hazard potential. The test flood is the PMF. Recommendations and remedial measures should be implemented by the owner. (Author)