首页> 美国政府科技报告 >National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report
【24h】

National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report

机译:国家大坝安全计划。高坝锁6,库存号(纽约401),奥斯威戈河流域,奥斯威戈县,纽约。第一阶段检查报告

获取原文

摘要

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additonal studies should be undertaken to further evaluate conditions affecting the dam. (1) Within one year of notification, complete the following investigations: (a) Perform a detailed investigation of the cracked and eroded concrete wall at the eastern portion of the intake structure which forms the western spillway abutment; and (b) Perform investigations to determine the effect of the deteriorated spillway surface concrete on the structural stability of the dam. (2) The following improvement needs have been investigated: (a) Repair the western abutment wall at the eastern portion of the intake structure that has been identified as severely eroded and cracked; (b) Repair the spillway surface which is severely eroded on the downstream face of the dam; (c) Repair the mechanical equipment supports, particularly those adjacent to the spillway abutment; and (d) Repair or verify the structural integrity of the lock walls, particularly where they affect the integrity of the dam abutment.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号