An Algorithm for Scheduling a Ship's Force During a Shipyard Overhaul

机译:船厂大修期间船舶力量调度算法

获取原文

摘要

This thesis considers the combining of a ship overhaul project network with a shipyard project network to minimize possible scheduling conflicts during the ship overhaul process. The combined project is called the ship overhaul project network. A heuristic multi-pass scheduling algorithm is developed to combine the ship's and shipyard's project networks. The algorithm is tested with two sets of data. The work spaces on shipboard are considered as a common resource to both project networks, and the ship's complement is an uncommon but limited resource. Since the real-world problem is larger than the context of this thesis, some simplifying assumptions were made. The most important of these are the reliable communication link between ship and shipyard prior to and/or during the overhaul process, and sufficient knowledge about the shipyard project network as early as possible after overhaul initiation. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号