首页> 外文会议>International conference on transportation engineering;ICTE 2011 >SHIPYARD SHIP SHIFTING SCHEDULING PROBLEM WITH DYNAMIC PROGRAMMING MODEL AND ITS FIVE-POINT APPROACH METHOD
【24h】

SHIPYARD SHIP SHIFTING SCHEDULING PROBLEM WITH DYNAMIC PROGRAMMING MODEL AND ITS FIVE-POINT APPROACH METHOD

机译:动态规划模型的船舶船舶换乘调度问题及其五点法。

获取原文

摘要

The paper develops the model of the shipyard ship shifting problem with Five-point Approach Method, and establishes the dynamic programming model of the topic problem, then discusses the basic solution principle of Five-point Approach Method(FPAM), finally solves the optimal approximate solution of the model through the Looking-Flower-Drawing (LFD) building. The paper provides a theory research of thinking for shipyard ship shifting scheduling problem for the shipyard.
机译:本文以五点进近法为模型,建立了船厂换船问题的模型,建立了主题问题的动态规划模型,讨论了五点进近法(FPAM)的基本求解原理,最后求解了最优近似法。通过“看花绘图(LFD)”构建模型的解决方案。本文为船厂的船舶调班计划问题提供了思想的理论研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号