Pol Pier Repairs, Lajes Field, Azores. Construction Inspection Visit Number 3, September 25-October 3, 1980

机译:pol pier修理,Lajes Field,亚速尔群岛。建筑检查访问1980年9月25日至10月3日的第3号

获取原文

摘要

Contents: Personnel; General Work Progress; General Work Remaining; Future Ship Berthings; General Time Schedule; Time Delays by Government; Future Work Sequence; Working Hours; Contractor's Work Force; Labor Contract and Wages; Weather Delays; Present Materials and Equipment; Steel Barge; Return of Equipment to U. S. A.; Rock Anchorages; Batter Pile Tie Down at Loading Platform; Epoxy Pressure Grout Repairs of Loading Platform; Harbor Bottom Elevations; New North Dolphin; New South Dolphin; Crushed Quarry Stone Fill; Sheet Pile Fendering for Loading Platform; Sea Cushion Fenders; Approach Roadway Concrete Spalling; Underwater Conditions of New Construction; Concrete Sand; General Facia Spall Repairs; Finders at Dolphin No. 4; Electrical Work; Cathodic Protection; Cleanup; DANAC Storage Shed; Contractor's Claims; Concrete Block Wharf Corner; Navy Resident Officer; Summary Meeting; and Future Inspection Visits.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号