首页> 美国政府科技报告 >Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam
【24h】

Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam

机译:Jackson mills和mine Falls Dams,Nashua,New Hampshire。侦察报告,水电可行性。第2卷。矿山大坝

获取原文

摘要

This study investigated hydroelectric development at Mines Falls Dam in Nashua New Hampshire. Reinstallation of hydroelectric power at Mines Falls Dam has been determined feasible. Two hydroelectric development plans were looked at in detail: (1) hydroelectric development at the dam site, (2) development along the canal about one mile downstream of the dam. Development at the dam was determined to be the most practical and feasible as it would not disturb the delicate canal system. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号