首页> 美国政府科技报告 >Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.
【24h】

Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

机译:临时可行性报告和环境影响声明草案,Grays Harbor,Chehalis和Hoquiam Rivers,华盛顿,航道的改进。

获取原文

摘要

The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at the outer bar and entrance to 38 feet through the estuary to Port of Grays Harbor terminals at Aberdeen and 36 feet above port terminals to Cosmopolis); (2) Replacement of the Union Pacific Railrod (UPRR) bridge at Aberdeen; (3) Construction of three turning basins (Hoquiam, Cow Point-Aberdeen, Elliott Slough above UPRR Bridge); (4) Mitigation of 4 acres of lost shallow water fish feeding habitat; (5) Mitigation through dredge modification to avoid increased juvenile and adult crab mortalities from dredging; (6) Improved aids to navigation; (7) Open-water disposal of dredged material at the harbor entrance (Point Chehalis and South Jetty sites) and in the ocean (about 3 1/2 miles from the harbor entrance).

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号