首页> 美国政府科技报告 >System Engineering Analysis of Air Conditioning, Heating, and Ventilation Systems Installed on LHA-1 and LPH-2 Class Ships.
【24h】

System Engineering Analysis of Air Conditioning, Heating, and Ventilation Systems Installed on LHA-1 and LPH-2 Class Ships.

机译:安装在LHa-1和LpH-2级船上的空调,供暖和通风系统的系统工程分析。

获取原文

摘要

The analysis documented herein is specifically applicable to the Air Conditioning, Heating, and Ventilation Systems--ship's work authorization boundary (SWAB) groups 511-1, 512-1, 513-1, 514-1, 514-2, and 514-3-- installed on LHA-1 and LPH-2 Class ships. The analysis considers only the systems and equipments installed and the documentation effective as of 22 April 1981. This system was selected for analysis by PERA (ASC) on the basis of its mission criticality and historical maintenance burden. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号