Introduction of Uncertainty Techniques to the Productivity Investment Fund

机译:生产力投资基金引入不确定性技术

获取原文

摘要

Each year the Defense Productivity Program Office (DPPO) disburses funds for Productivity Investment Projects (PIFs). The purpose of these projects is to increase productivity within the Department of Defense (DOD). To enhance these efforts, DPPO requested a study to be conducted to determine if methods of risk or uncertainty will affect the results obtained by the current procedure. This study applies various principles of uncertainty to this procedure and examines their impact on the project rankings. A background of DPPO and PIFs is presented together with discussion of risk and uncertainty techniques, as well as the economic indicators used in ranking projects. A model is then explained which will introduce uncertainty into the present procedure. Results of the initial comparison and sensitivity analysis is revealed. Conclusions are drawn based on these results and recommendations concerning alternate procedures and possible further research are presented. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号