首页> 美国政府科技报告 >Readiness or Resources: Which Comes First
【24h】

Readiness or Resources: Which Comes First

机译:准备或资源:哪个是第一位的

获取原文

摘要

This report concerns a statistical problem in estimating relationships between resources and readiness. In policy language, the question is which term, resources or readiness, is the discretionary, or causal variable, and which is the determined, or effect variable. In statistical terms, the question is which variable to put on the left-hand side of a statistical regression relationship. Although this issue could arise in studying any area of the budget, we will discuss it in the context of the Naval shore establishment. Such relationships can be useful in determining the cost of bringing deficient bases up to a desired readiness level, or allocating a given BOS budget across bases in order to achieve a uniform state of readiness. This report is concerned with the analytical methodology for relating readiness to spending. We will assume the Navy has managed to obtain reasonable measures of readiness. The question, therefore, is how estimating the relationship between the readiness (R) and BOS cost (C) of a base (in either a cross-section or a time-series analysis).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号