首页> 美国政府科技报告 >Technology Insertion (TI)/Industrial Process Improvement (IPI) Task Order Number 1. Data Base Documentation Book for WR-ALC/MANPSC (Bonded Honeycomb).
【24h】

Technology Insertion (TI)/Industrial Process Improvement (IPI) Task Order Number 1. Data Base Documentation Book for WR-ALC/MANPSC (Bonded Honeycomb).

机译:技术插入(TI)/工业过程改进(IpI)任务订单号1. WR-aLC / maNpsC(Bonded Honeycomb)的数据库文档手册。

获取原文

摘要

MANPSC is an RCC (Resource Control Center) with MANPS section of the Industrial Products Division (MAN) at WR-ALC. MANPSC is located in Building 169. The primary workload in MANPSC consists of MISTR work consisting of some adhesive bonding work and conventional sheet metal work, namely; C-141 AFT cowling, C-141 thrust door, C-130 cowl scoop, C-130 elevator, and C-130 flaps. MANPSC is comprised mainly of conventional sheet metal and certain specialized composite material fabrication equipment. This Technology Insertion (TI)/Industrial Process Improvement (IPI) data base documentation book for WR-ALC/MANPSC (Bonded honeycomb) contains detailed information about layouts equipment and processes for this RCC.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号