首页> 美国政府科技报告 >Analysis of In-Transit Lead Time for Asset Delivery at Ogden Air Logistics Center.
【24h】

Analysis of In-Transit Lead Time for Asset Delivery at Ogden Air Logistics Center.

机译:Ogden航空物流中心资产交付的中转时间分析。

获取原文

摘要

Maintenance Inventory Centers (MICs) are forward stockage points for Depot Maintenance activities. AFLC has directed that the amount of material stocked in MICs be reduced. The in-transit delivery time for replenishment issues to MICs from Depot Supply has significant impact on material support concurrent with minimizing inventory levels. This thesis examined MIC stock replenishment in-transit time. In-transit times experienced during a six-month period in six MICs at Hill AFB, Utah (Ogden ALC) were analyzed to establish performance parameters for simulation analyses. Also, quality control tools to reduce the in-transit time and associated variability were also investigated. Empirical in-transit time performance statistics implied the AFLC 1.5 working day delivery time standard for MIC replenishment issues was not being achieved for all MICs. Fitting empirical data to theoretical probability distributions for use in subsequent simulation experiments supported previous research that lead time data is occasionally so variable that it may not fit familiar theoretical probability distributions. (KR)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号