首页> 美国政府科技报告 >Long-Term Effects of Dredging Operations Program. Long-Term Evaluation of Plants and Animals Colonizing Contaminated Estuarine Dredged Material Placed in Both Upland and Wetland Environments.
【24h】

Long-Term Effects of Dredging Operations Program. Long-Term Evaluation of Plants and Animals Colonizing Contaminated Estuarine Dredged Material Placed in Both Upland and Wetland Environments.

机译:疏浚作业计划的长期影响。植被和动物的长期评估定居在陆地和湿地环境中的污染的河口疏浚物。

获取原文

摘要

Contaminated sediment was dredged from Black Rock Harbor, Connecticut, in October 1983 and placed in aquatic, upland, and wetland environments as part of the Field Verification Program (FVP), conducted during the period 1981-1986. Laboratory tests were conducted on the sediment prior to dredging to evaluate potential contaminant mobility under each of the disposal alternatives. Prior to dredging for upland disposal and wetland creation at the FVP field site, upland tests (i.e., plant and earthworm bioassays) and wetland tests (i.e., plant, sandworm, snail, and mussel bioassays) were conducted. Laboratory test results were sub-subsequently field verified at the field test site at Tongue Point, Bridgeport, CT. The results of the upland disposal and wetland creation portions of the FVP, and the changes occurring since completion of the FVP for each disposal environment, are summarized herein. The emphasis of this report is on the contaminant mobility of heavy metals. This interim report includes data collected through 1989. Contaminant mobility and the progressive development of the upland and wetland ecosystems at this site will be evaluated until September 1985.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号